Bonhag Associates Banner
Red Line
Planning and Programming MEP/FP Innovative Design, MEP Innovative Design Process Design, Process Analysis, Process Analysis and Design Energy Analysis and Design Problem Solving, Trouble Shooting Code Review and Forensic Analysis
Red Line
 
Press Releases
Publications and Articles
Newest Innovations

Featured Projects
Our Brochures

Meet the Associates
Professional Alliances

Certifications and Project Sites   
Memberships and Recognitions

Bonhag Music

 
"We have been very pleased to rely on your services in code review of large and complicated projects that have been proposed for construction. Your reviews have been very prompt and reliable; and they have been extremely thorough and thoughtful. Not only have they been rigorous with respect to the stipulations of building, fire, and safety codes, but you have accompanied them with sound practical suggestions and presentation of realistic options. It is obvious that the advice you give us is based on years of solid professional experience."
—Jonathan Edwards (Town of Hanover, NH)

Code review is one of our specialties; we produce results that are excellent from the client's standpoint and additionally meet current and anticipated codes and standards. As members of NFPA, IBC, ASHRAE, IEEE, IAEI, IES and other organizations, we are familiar with the various code requirements for commercial, industrial and institutional facilities. Bonhag Associates provides code review services for various local code officials, municipalities, agencies, and design clients. We maintain good relationships with local and state regulators, which allows our projects to move through the code reviews smoothly. We are also familiar with ADA and National Historic code requirements, which require extensive attention when addressing a project specific situation.

With over forty (40) years of experience, Bonhag Associates is able to rely on their mechanical, electrical, plumbing, and process expertise to analyze situations and reach solid conclusions for forensic analysis. We have worked successfully on projects to help resolve situations for our clients.

Bonhag Asssociates provided code review for the following:

  • Alice Peck Day Memorial Hospital—Various Upgrades
  • Bridgman Building—Historic Commercial Space Conversion
  • Centerra Office Complex—Multi-Use Office Building
  • Harvest Hill Independent/Assisted Living Facility—Addition
  • Kmon, Osofsky, and Sabatelle, DDS—Renovation
  • Kohl's Department Store—Renovation
  • L. L. Bean Factory and Retail Store
  • LA Fitness—Olympic Swimming Pools
  • Marriott Hotel and Conference Center
  • MOD-PAC Corp.—Gas-Fired CHP Plant and HVAC Systems
  • Montshire Museum of Science—Unique Outside Water Park
  • North Country Health Systems—Biomass CHP Plant
  • North Maynard Dormitories at Dartmouth College
  • Optimum, Inc.—High-Tech Manufacturing
  • Pacific Electric and Gas—Power Plant Control Rooms
  • Sachem Village—Graduate Housing Community
  • Simon Pearce Restaurant and Retail Store
  • South Block Parking Garage—Underground Parking
  • South St. Mixed-Use Buildings—Dartmouth College Real Estate
  • Spectra, Inc.—Clean Rooms, Laboratories, and Offices
  • Sprint Telecommunications—Cellular Tower Control Buildings
  • Stryker Biotech Pharmaceutical—High-Tech Manufacturing
  • Thayer School of Engineering at Dartmouth College

Forensic analysis and creative solutions were provided for the following projects to achieve the requests of our clients:

    Code Review Depicted in Photographs
  • Brick Manufacturing Plant: Analyzed and provided corrective measures for a brick manufacturing facility.

  • Municipal Swimming Pool: Analyzed the design and corrective measures for a dehumidifier in a municipal swimming pool.

  • Public School: Analyzed the design and suggested corrective measures for a noisy HVAC system and an HVAC system that did not have adequate cooling in certain areas.

  • Scrubber System: Analyzed the design and suggested corrective measures for a failed scrubber system. Provided anticipated renovation and replacement costs.

  • Telecommunications Facility: Analyzed the construction costs and extended costs for delays in the construction and decision-making process.

  • Steam Plant: Analyzed the design and suggested corrective action for a steam system that was not working properly.
 
 2,159 Visits
 31 This Month
HOME HOME HOME